WATSON GYM EQUIPMENT
SWITZERLAND

Gym Equipment & Fitness Studio Solutions in Switzerland.

Premium strength equipment, free weights and gym flooring for commercial gyms, personal training studios, sports facilities, physiotherapy, hotels and private gyms.

Official Watson Gym Equipment Distributor
Switzerland & Liechtenstein – including planning, delivery, installation and consultation.

by Charly Burger et Fille GmbH

SCROLL
Watson Gym Equipment

WATSON GYM EQUIPMENT IN SWITZERLAND

Premium Strength Equipment Engineered Manufactured in the United Kingdom

Watson Gym Equipment is internationally recognised for manufacturing some of the most robust and precisely engineered strength equipment in the world.

Designed and manufactured in the United Kingdom, Watson machines are built for demanding commercial gyms, performance facilities and private training environments, combining exceptional durability with outstanding biomechanics.

Through Charly Burger et Fille GmbH, Watson Gym Equipment is officially distributed across Switzerland and Liechtenstein.

  • Plate Loaded Strength Machines
  • Single and Dual Stack Machines
  • Racks, Benches Plates and Dumbbells
  • Custom Equipment Configurations




EQUIPMENT CUSTOMISATION & OPTIONS

Watson Gym Equipment can be fully customised with a wide range of finishes, upholstery, frame colours and specification options to match functional requirements and gym interior design concepts.

Custom colour option 1 Custom colour option 2 Custom colour option 3 Custom colour option 4

FULL COLOUR CUSTOMISATION

Watson equipment can be colour-matched to create a stronger visual identity and a more cohesive gym concept.

Upholstery and Detail Options

UPHOLSTERY & DETAIL OPTIONS

Upholstery colours, stitching variations and selected detailing can be adapted to create a more individual and refined equipment appearance.



EQUIPMENT UPGRADES & OPTIONS

Watson Gym Equipment can be upgraded with a wide range of premium configuration options:

Seats: Real leather seats, custom stitching patterns, printed or embroidered logos
Frames: Custom RAL frame colours or stainless steel
Weight Stacks: Additional weight, micro adjusters
Stack Guards: Regular and custom stack guards



INDUSTRY-LEADING WARRANTY

Watson strength equipment includes:

• 5-year warranty on all moving parts
• Lifetime warranty on structural frames
• Lifetime warranty on dumbbells, barbells and plates

This reflects the exceptional engineering quality and durability of Watson equipment.




Customisation options help create equipment systems that feel both technically precise and visually cohesive.

STAINLESS STEEL
DUMBBELLS, BARBELLS, KETTLEBELLS & PLATES

Watson also manufactures precision-machined stainless steel dumbbells, barbells, kettlebells and weight plates for professional gym environments, strength training facilities and high-performance training spaces.


Available Options:
• Stainless steel dumbbells from 2.5 - 195kg, handles 35mm fixed, 40mm and 50mm revolving
• Stainless steel barbells (EZ and straight) 10 - 65kg
• Stainless steel kettlebells
• Stainless steel weight plates 1.25 - 25kg
• Custom logos
• Lifetime structural warranty

This combination of material quality and manufacturing precision ensures unmatched durability for professional training facilities.

GYM EQUIPMENT & FITNESS STUDIO SOLUTIONS
IN SWITZERLAND

Professional gym equipment solutions for commercial fitness studios, personal training studios, sports centres, physiotherapy practices, hotels and private gyms in Switzerland.

Charly Burger et Fille GmbH delivers tailored strength equipment solutions using Watson Gym Equipment, designed for durability, performance and long-term intensive use.

Each project is individually planned to match training concepts, available space, target audience and operational requirements.

Fitness Studios

FITNESS STUDIOS

Professional premium strength training equipment solutions for commercial fitness studios seeking durable machines designed for intensive daily use.

Personal Training Studios

PERSONAL TRAINING STUDIOS

Efficient and space-optimised equipment configurations tailored for personal training studios and boutique fitness environments.

Performance Training Facilities

PERFORMANCE
TRAINING FACILITIES

Professional strength equipment for athletic training environments, strength coaches and high-performance training facilities.

Public Sports Facilities and Educational Institutions

PUBLIC SPORTS FACILITIES
& EDUCATIONAL INSTITUTIONS

Robust strength equipment solutions for public sports centres, schools, gymnasiums and institutional training facilities designed for long-term reliability and supervised use.

GYM FLOORING SOLUTIONS IN SWITZERLAND

Professional gym flooring solutions in Switzerland are essential for creating durable, safe and high-performance training environments for commercial gyms, personal training studios and rehabilitation facilities.

Flooring systems can be planned for heavy strength zones, functional training areas and performance spaces with project-specific material selection and layout support.

Strength Training Floors

STRENGTH TRAINING FLOORS

Heavy-duty rubber flooring designed for strength training zones and weightlifting areas.

These systems are engineered to withstand heavy loads, dropped weights and intensive commercial training environments.

Functional and Group Training Areas

FUNCTIONAL
& GROUP TRAINING AREAS

Specialised flooring solutions for group training spaces and functional training zones.

These surfaces provide durability, traction and comfort for high-frequency use.

Physiotherapy and Rehabilitation Areas

PHYSIOTHERAPY & REHABILITATION AREAS

Flooring systems designed for physiotherapy practices, rehabilitation centres and medical training environments.

Options include:

• Custom floor markings
• Training grids and movement zones
• Shock-absorbing surfaces




Flooring planning can be integrated into broader equipment projects to ensure a cohesive, durable and visually consistent result across the entire facility.

GYM PLANNING, DELIVERY & INSTALLATION
IN SWITZERLAND

From first layout studies to final installation, Charly Burger et Fille provides complete project support for commercial and private training facilities throughout Switzerland and Liechtenstein.

Our team can coordinate equipment selection, gym zoning and workflow, flooring integration, delivery planning and implementation support to ensure a structured and efficient project process.

We work closely with architects, interior designers, facility managers and private clients to create tailored and functional training environments.


SERVICES INCLUDE

  • Facility layout and zoning support
  • Equipment planning and specification
  • Strength and functional flooring integration
  • Delivery coordination and installation support
  • Upgrade concepts for existing training environments

Each solution is planned to optimise circulation, equipment placement and long-term usability. Project partners receive guidance throughout the workflow, from first concept considerations to final functional training execution.

Project planning layout
Gym installation project


Whether creating a new strength room or modernising a training environment, project support is designed to ensure clarity, efficiency and durable results.

CONSULTATION & PLANNING

Preliminary project consultation, equipment selection and facility layout planning tailored to each training environment.

INSTALLATION

Professional installation and commissioning of Watson strength equipment and training infrastructure.

SERVICE & MAINTENANCE

Long-term service, maintenance and technical support ensuring reliable performance of all installed equipment.

GYM EQUIPMENT FINANCING IN SWITZERLAND

Financing solutions are available for companies, commercial operators and new business start-ups planning professional gym equipment projects in Switzerland.

Flexible financing support can help structure commercial equipment investments for new facilities, studio upgrades and staged business development.

Please note: Financing enquiries are available for companies and new business start-ups only. Financing is not available for private individuals.


AVAILABLE FOR

  • Commercial fitness studios
  • Personal training businesses
  • Performance training centres
  • Sports and training businesses
  • New business start-ups
  • Professional facility upgrades

Financing options are adapted to project scope, investment timing and operational priorities.



SUPPORT THROUGHOUT THE PROCESS

Our team can support project clarification, equipment selection and coordination of financing enquiries so that commercial installations can be planned with greater security and transparency.

COMMERCIAL
FINANCING

Structured solutions for businesses investing in professional training environments.

START-UP
SUPPORT

Suitable for new business foundations and staged gym development concepts.

PLANNED
INVESTMENT

Supports durable long-term equipment projects with improved planning security.

SHOWROOM & GYM EQUIPMENT CONSULTATION IN SWITZERLAND

We offer showroom visits and private consultation appointments for clients interested in Watson Gym Equipment and tailored project development.

Appointments are ideal for commercial operators, architects, designers and private clients seeking premium strength training solutions.

Consultations are scheduled by prior appointment and provide the opportunity to review equipment details, planning approaches and material quality in person.

Showroom consultation

SHOWROOM VISITS

  • Private appointment setting
  • Product and material presentation
  • Equipment review for specific projects
  • Consultation for commercial and private facilities

Showroom visits by prior appointment only.


LOCATION

Watson Gym Equipment Switzerland
by Charly Burger et Fille GmbH

Oberdorfstrasse 24
3296 Arch | Switzerland

For appointments and private consultations, please contact us directly.

GYM INSTALLATION PROJECTS IN SWITZERLAND

Charly Burger et Fille GmbH has delivered Watson Gym Equipment installations across Switzerland and Liechtenstein for professional training facilities, boutique studios and private training environments.

Each installation is individually planned to ensure optimal equipment layout, durable flooring solutions and long-term training performance.

Project scope may include commercial fitness studio equipment, training room upgrades, home gym and wellness training facilities.

PROJECT TYPES

Each installation is selected here to clarify the training and user environment.

Commercial Fitness Studios

COMMERCIAL FITNESS STUDIOS

Professional strength training environments designed for intensive commercial use.

Montreux, Switzerland
Personal Training Studios

PERSONAL TRAINING STUDIOS

Compact training spaces designed for performance coaching and private training.

Zurich, Switzerland
Performance Training Facilities

PERFORMANCE TRAINING FACILITIES

High-performance strength environments for athletic development.

Basel, Switzerland
Private Training Gyms

PRIVATE TRAINING GYMS

High-quality strength equipment installations for dedicated home training environments.

Geneva, Switzerland
Public Sports Facilities and Educational Institutions

PUBLIC SPORTS FACILITIES & EDUCATIONAL INSTITUTIONS

Robust training installations adapted to multifunctional sports centres, schools and educational institutes.

Chur, Switzerland
Outdoor Training Installations

OUTDOOR TRAINING INSTALLATIONS

Durable outdoor strength and functional solutions designed for open-air training spaces.

Thun, Switzerland
Gym Flooring Installation

GYM FLOORING INSTALLATION

Professional flooring systems designed for strength training zones, functional training areas and rehabilitation environments.

Wangen an der Aare, Switzerland
British Splendour
British Splendour Interior

BESPOKE PRIVATE GYM INTERIORS

British Splendour is the luxury private gym interior atelier of Charly Burger et Fille, specialising in bespoke training environments for private residences, alpine chalets and exceptional hospitality properties.

These spaces combine premium Watson strength equipment and premium flooring with curated materials, refined finishes and architectural integration.

Each project is developed in close collaboration with architects, interior designers and private clients to create unique and highly personalised training environments.


PROJECT ENVIRONMENTS

  • Private residences and estates
  • Alpine chalets
  • Luxury hospitality and wellness spaces
  • Private performance training environments



British Splendour creates refined training spaces where performance equipment meets interior architecture.

CONTACT & CONSULTATION

Planning a professional training facility or upgrading your existing gym environment?

Our team provides consultation, equipment planning and project support for fitness studios, performance facilities, public sports institutions and private training environments.

Consultations include equipment selection, facility layout planning and project development.

Showroom visits available by prior appointment.

For project enquiries, showroom appointments or equipment consultations, please use the form. Our team will respond within 1–2 business days.

WATSON GYM EQUIPMENT SWITZERLAND
by Charly Burger et Fille GmbH